Before

Recently. It looks like a double in size.

The signature sign of a “P.G. Remodel” – leave one wall standing for historical purposes, then build a structure two or three times bigger around it.

Before

Recently. It looks like a double in size.

The signature sign of a “P.G. Remodel” – leave one wall standing for historical purposes, then build a structure two or three times bigger around it.

It’s taking forever, probably because it’s being done with volunteer Rotary (old-fart)labor.
And there seems to be a tie-in now with sustainable PG doing some sort of water or energy experimental showcase project there. Maybe they need to grow some vector habitat like up at the “Green” Spot?
It’s a Mommar project. That explains it.
& if molds sets in, as it is, then they shouldn’t be able to use it.